Zone 11A, B, or C

Appendix 1 - Drainage Fee Schedule "A" - Fee Schedule Effective March 3, 2025

Zone 11A Fees (per acre)

Land Use March 2025 Zone 11A Fee (per acre) March 2025 Fee for Parcels Recorded before 8/16/2004 (per acre) March 2025 Beach Stone Lake (per acre)
Raw Land and Open Space $0 $0 $0
Road Right-of-Way, greater than 40' [1] $0 $0 $0
Residence on 5.0 acres [5] $0 $0 $0
Residence on 3.5 acres [5] $6,771 $1,202 $21
Residence on 2.0 acres [5] $13,505 $2,101 $38
Residence on 1.0 acres [5] $17,981 $4,202 477
Residence on 0.50 acres [5] $18,517 $8,217 $156
Residence on 0.25 acres [5] $21,011 $15,691 $311
Residence on 0.20 acres [5] $21,745 $19,148 $388
Residence on 0.14 acres [5] $22,788 $22,788 $388
Residence on 0.10 acres [5] $24,758 $24,758 $388
Residential RD20 to RD30 $26,404 $26,404 $388
Mobilehome Park $27,267 $27,267 $388
Industrial $28,644 $28,644 $388
Commercial (office/retail) $29,196 $29,196 $388
Parking Lot $29,196 $29,196 $388
Public School Campus [6] $22,788 $22,788 $388
School Campus with detention [2] $11,393 $11,393 $388
Sports Field graded with field drains $17,671 $17,671 $388
Sports Field no piped field drains $6,771 $6,771 $388
Sports Field with detention [2] $3,386 $3,386 $388
Impervious areas of park [2] $29,196 $29,196 $388

[1] The fees are calculated based on the net parcel area plus 20 feet of road width. 

That is, a 1.00 acre parcel fronting 300 feet of a thoroughfare shall pay fees based on 43560sf + (300' x 20') = 1.138 acre

[2] Pursuant to Section 2.50.050, a school or park that detains greater than 50% of the peak flow volume, at the discretion of Water Resources, may reduce the fee by 50%.

[3] Beach Stone Lake Volume Mitigation Fee is accounted for separate from Zone 11A.

[4] Pursuant to Section 2.50.060 the fee is reduced for parcels recorded prior to adoption of this Fee Plan. RD5 and larger lots are adjusted to 2003 fee plus 20%.

[5] Equation- use straight line interpolation.

[6] Public Schools pay one time as they don’t necessarily return to county for additional building permits.

Zone 11B Fees (per acre)

Land Use March 2025 Zone 11B Fee (per acre) March 2025 Fee for Parcels Recorded before 8/16/2004 (per acre)
Raw Land and Open Space $0 $0
Road Right-of-Way, greater than 40' [1] $0 $0
Residence on 5.0 acres(+) [4] $0 $0
Residence on 3.5 acres [4] $4,811 $942
Residence on 2.0 acres [4] $9,625 $1,649
Residence on 1.0 acres [4] $12,834 $3,294
Residence on 0.50 acres [4] $13,114 $6,592
Residence on 0.25 acres [4] $14,333 $13,183
Residence on 0.20 acres [4] $14,704 $14,615
Residence on 0.14 acres [4] $15,184 $15,093
Residence on 0.10 acres [4] $16,480 $16,382
Residential RD20 to RD30 $17,587 $17,481
Mobilehome Park $19,023 $18,908
Industrial $19,023 $18,908
Commercial (office/retail) $19,271 $19,156
Parking Lot $19,271 $19,156
Public School Campus [5] $15,184 $15,093
School Campus with detention [2] $7,591 $7,549
Sports Field graded with field drains $12,834 $12,757
Sports Field no piped field drains $4,811 $4,784
Sports Field with detention [2] $2,405 $2,391
Impervious areas of park [2] $19,271 $19,156

[1] The fees are calculated based on the net parcel area plus 20 feet of road width. 

That is, a 1.00 acre parcel fronting 300 feet of a thoroughfare shall pay fees based on 43560sf + (300' x 20') = 1.138 acre

[2] Pursuant to Section 2.50.050, a school or park that detains greater than 50% of the peak flow volume, at the discretion of Water Resources, may reduce the fee by 50%.

[3] Pursuant to Section 2.50.060 the fee is reduced for parcels recorded prior to adoption of this Fee Plan. RD5 and larger lots are adjusted to 2003 fee plus 20%.

[4] Equation- use straight line interpolation.

[5] Public Schools pay one time as they don’t necessarily return to county for additional building permits.

Zone 11C Fees (per acre)

Land Use March 2025 Zone 11C Fee (per acre) March 2025 Fee for Parcels Recorded before 8/16/2004 (per acre) March 2025 Sheds Flowing to Dry Creek into Placer County (add'l fee/acre) March 2025
Sheds Flowing to
Linda Creek
(add'l fee/acre)
March 2025 Sheds Flowing to NEMDC Tributaries (add'l fee/acre)
Raw Land and Open Space $0 $0 $0 $0 $0
Road Right-of-Way, greater than 40' [1] $0 $0 $0 $0 $0
Residence on 5.0 acres(+) [5] $0 $0 $0 $0 $0
Residence on 3.5 acres [5] $6,835 $1,000 $76 $299 $424
Residence on 2.0 acres [5] $13,670 $1,750 $133 $522 $456
Residence on 1.0 acres [5] $18,230 $3,495 $266 $1,043 $485
Residence on 0.50 acres [5] $18,772 $6,992 $533 $1,324 $594
Residence on 0.25 acres [5] $21,138 $13,983 $1,064 $1,324 $704
Residence on 0.20 acres [5] $21,865 $17,479 $1,330 $1,324 $758
Residence on 0.14 acres [5] $22,796 $22,796 $1,862 $1,324 $826
Residence on 0.10 acres [5] $24,536 $24,536 $2,026 $1,324 $919
Residential RD20 to RD30 $25,987 $25,987 $2,026 $1,324 $995
Mobilehome Park $26,748 $26,748 $2,026 $1,324 $1,031
Industrial $28,003 $28,003 $2,026 $1,324 $1,069
Commercial (office/retail) $28,498 $28,498 $2,026 $1,324 $1,069
Parking Lot $28,498 $28,498 $2,026 $1,324 $1,069
Public School Campus [6] $22,796 $22,796 $2,026 $1,324 $826
School Campus with detention [2] $11,399 $11,399 $2,026 $1,324 $826
Sports Field graded with field drains $18,230 $3,495 $2,026 $1,324 $485
Sports Field no piped field drains $6,835 $1,000 $2,026 $1,324 $424
Sports Field with detention [2] $3,419 $498 $2,026 $1,324 $424
Impervious areas of park [2] $28,498 $28,498 $2,026 $1,324 $1,069

[1] The fees are calculated based on the net parcel area plus 20 feet of road width. 

That is, a 1.00 acre parcel fronting 300 feet of a thoroughfare shall pay fees based on 43560sf + (300' x 20') = 1.138 acre

[2] Pursuant to Section 2.50.050, a school or park that detains greater than 50% of the peak flow volume, at the discretion of Water Resources, may reduce the fee by 50%.

[3] Beach Stone Lake Volume Mitigation Fee is accounted for separate from Zone 11A.

[4] Pursuant to Section 2.50.060 the fee is reduced for parcels recorded prior to adoption of this Fee Plan. RD5 and larger lots are adjusted to 2003 fee plus 20%.

[5] Equation- use straight line interpolation.

[6] Public Schools pay one time as they don’t necessarily return to county for additional building permits.

Zone 11A Reduced Fees (per acre)

Land Use March 2025 Zone 11A Fee for LAGUNA WEST, LAKESIDE, ELLIOTT RANCH SOUTH (per acre) March 2025 Zone 11A Fee for Laguna Business Park (Laguna Oaks, Parkside), Calvine-99 SPA (per acre)
Raw Land and Open Space $0 $0
Road Right-of-Way, greater than 40' [1] $0 $0
Residence on 5.0 acres(+) [4] $0 $0
Residence on 3.5 acres [4] $488 $680
Residence on 2.0 acres [4] $852 $1,188
Residence on 1.0 acres [4] $1,705 $2,377
Residence on 0.50 acres [4] $3,413 $4,754
Residence on 0.25 acres [4] $6,823 $9,506
Residence on 0.20 acres [4] $8,529 $11,883
Residence on 0.14 acres [4] $8,646 $12,118
Residence on 0.10 acres [4] $8,823 $12,472
Residential RD20 to RD30 $9,275 $13,443
Mobilehome Park $9,727 $14,416
Industrial $10,177 $15,388
Commercial (office/retail) $10,628 $16,360
Parking Lot $10,628 $16,360
Public School Campus [5] $7,021 $10,078
School Campus with detention [2] $7,021 $10,078
Sports Field graded with field drains $2,843 $3,799
Sports Field no piped field drains $2,843 $3,799
Sports Field with detention [2] $2,843 $3,799
Impervious areas of park [2] $10,628 $16,360