Zone 11A, B, or C

Appendix 1 - Drainage Fee Schedule "A" - Fee Schedule Effective March 2, 2026

Zone 11A Fees (per acre)

Land Use March 2026 Zone 11A Fee (per acre) March 2026 Fee for Parcels Recorded before 8/16/2004 (per acre) March 2026 Beach Stone Lake (per acre)
Raw Land and Open Space $0 $0 $0
Road Right-of-Way, greater than 40' [1] $0 $0 $0
Residence on 5.0 acres [5] $0 $0 $0
Residence on 3.5 acres [5] $6,839 $1,214 $21
Residence on 2.0 acres [5] $13,640 $2,122 $38
Residence on 1.0 acres [5] $18,161 $4,244 $78
Residence on 0.50 acres [5] $18,702 $8,299 $158
Residence on 0.25 acres [5] $21,221 $15,848 $314
Residence on 0.20 acres [5] $21,963 $19,340 $392
Residence on 0.14 acres [5] $23,016 $23,016 $392
Residence on 0.10 acres [5] $25,006 $26,006 $392
Residential RD20 to RD30 $26,668 $26,668 $392
Mobilehome Park $27,540 $27,540 $392
Industrial $28,951 $28,951 $392
Commercial (office/retail) $29,488 $29,488 $392
Parking Lot $29,488 $29,488 $392
Public School Campus [6] $23,016 $23,016 $392
School Campus with detention [2] $11,507 $11,507 $392
Sports Field graded with field drains $17,848 $17,848 $392
Sports Field no piped field drains $6,839 $6,829 $392
Sports Field with detention [2] $3,420 $3,420 $392
Impervious areas of park [2] $29,488 $29,488 $392

[1] The fees are calculated based on the net parcel area plus 20 feet of road width. 

That is, a 1.00 acre parcel fronting 300 feet of a thoroughfare shall pay fees based on 43560sf + (300' x 20') = 1.138 acre

[2] Pursuant to Section 2.50.050, a school or park that detains greater than 50% of the peak flow volume, at the discretion of Water Resources, may reduce the fee by 50%.

[3] Beach Stone Lake Volume Mitigation Fee is accounted for separate from Zone 11A.

[4] Pursuant to Section 2.50.060 the fee is reduced for parcels recorded prior to adoption of this Fee Plan. RD5 and larger lots are adjusted to 2003 fee plus 20%.

[5] Equation- use straight line interpolation.

[6] Public Schools pay one time as they don’t necessarily return to county for additional building permits.

Zone 11B Fees (per acre)

Land Use March 2026 Zone 11B Fee (per acre) March 2026 Fee for Parcels Recorded before 8/16/2004 (per acre)
Raw Land and Open Space $0 $0
Road Right-of-Way, greater than 40' [1] $0 $0
Residence on 5.0 acres(+) [4] $0 $0
Residence on 3.5 acres [4] $4,859 $951
Residence on 2.0 acres [4] $9,721 $1,666
Residence on 1.0 acres [4] $12,962 $3,327
Residence on 0.50 acres [4] $13,245 $6,592
Residence on 0.25 acres [4] $14,476 $13,315
Residence on 0.20 acres [4] $14,851 $14,761
Residence on 0.14 acres [4] $15,336 $15,244
Residence on 0.10 acres [4] $16,645 $16,546
Residential RD20 to RD30 $17,763 $17,656
Mobilehome Park $19,213 $19,097
Industrial $19,213 $18,097
Commercial (office/retail) $19,464 $19,348
Parking Lot $19,464 $19,348
Public School Campus [5] $15,336 $15,244
School Campus with detention [2] $7,667 $7,625
Sports Field graded with field drains $12,962 $12,885
Sports Field no piped field drains $4,859 $4,832
Sports Field with detention [2] $2,429 $2,415
Impervious areas of park [2] $19,464 $19,348

[1] The fees are calculated based on the net parcel area plus 20 feet of road width. 

That is, a 1.00 acre parcel fronting 300 feet of a thoroughfare shall pay fees based on 43560sf + (300' x 20') = 1.138 acre

[2] Pursuant to Section 2.50.050, a school or park that detains greater than 50% of the peak flow volume, at the discretion of Water Resources, may reduce the fee by 50%.

[3] Pursuant to Section 2.50.060 the fee is reduced for parcels recorded prior to adoption of this Fee Plan. RD5 and larger lots are adjusted to 2003 fee plus 20%.

[4] Equation- use straight line interpolation.

[5] Public Schools pay one time as they don’t necessarily return to county for additional building permits.

Zone 11C Fees (per acre)

Land Use March 2026 Zone 11C Fee (per acre) March 2026 Fee for Parcels Recorded before 8/16/2004 (per acre) March 2026 Sheds Flowing to Dry Creek into Placer County (add'l fee/acre) March 2026
Sheds Flowing to
Linda Creek
(add'l fee/acre)
March 2026 Sheds Flowing to NEMDC Tributaries (add'l fee/acre)
Raw Land and Open Space $0 $0 $0 $0 $0
Road Right-of-Way, greater than 40' [1] $0 $0 $0 $0 $0
Residence on 5.0 acres(+) [5] $0 $0 $0 $0 $0
Residence on 3.5 acres [5] $6,903 $1,010 $77 $302 $428
Residence on 2.0 acres [5] $13,807 $1,768 $134 $527 $461
Residence on 1.0 acres [5] $18,412 $3,530 $269 $1,053 $490
Residence on 0.50 acres [5] $18,960 $7,062 $538 $1,337 $600
Residence on 0.25 acres [5] $21,350 $14,123 $1,075 $1,337 $711
Residence on 0.20 acres [5] $22,084 $17,654 $1,343 $1,337 $766
Residence on 0.14 acres [5] $23,024 $23,024 $1,881 $1,337 $834
Residence on 0.10 acres [5] $24,782 $24,782 $2,046 $1,337 $928
Residential RD20 to RD30 $26,247 $26,247 $2,046 $1,337 $1,005
Mobilehome Park $27,016 $27,016 $2,046 $1,337 $1,041
Industrial $28,283 $28,283 $2,046 $1,337 $1,080
Commercial (office/retail) $28,783 $28,783 $2,046 $1,337 $1,080
Parking Lot $28,783 $28,783. $2,046 $1,337 $1,080
Public School Campus [6] $23,024 $23,024 $2,046 $1,337 $834
School Campus with detention [2] $11,513 $11,513 $2,046 $1,337 $834
Sports Field graded with field drains $18,412 $3,530 $2,046 $1,337 $490
Sports Field no piped field drains $6,903 $1,010 $2,046 $1,337 $428
Sports Field with detention [2] $3,453 $503 $2,046 $1,337 $428
Impervious areas of park [2] $28,783 $28,783 $2,046 $1,337 $1,080

[1] The fees are calculated based on the net parcel area plus 20 feet of road width. 

That is, a 1.00 acre parcel fronting 300 feet of a thoroughfare shall pay fees based on 43560sf + (300' x 20') = 1.138 acre

[2] Pursuant to Section 2.50.050, a school or park that detains greater than 50% of the peak flow volume, at the discretion of Water Resources, may reduce the fee by 50%.

[3] Beach Stone Lake Volume Mitigation Fee is accounted for separate from Zone 11A.

[4] Pursuant to Section 2.50.060 the fee is reduced for parcels recorded prior to adoption of this Fee Plan. RD5 and larger lots are adjusted to 2003 fee plus 20%.

[5] Equation- use straight line interpolation.

[6] Public Schools pay one time as they don’t necessarily return to county for additional building permits.

Zone 11A Reduced Fees (per acre)

Land Use March 2026 Zone 11A Fee for LAGUNA WEST, LAKESIDE, ELLIOTT RANCH SOUTH (per acre) March 2026 Zone 11A Fee for Laguna Business Park (Laguna Oaks, Parkside), Calvine-99 SPA (per acre)
Raw Land and Open Space $0 $0
Road Right-of-Way, greater than 40' [1] $0 $0
Residence on 5.0 acres(+) [4] $0 $0
Residence on 3.5 acres [4] $493 $686
Residence on 2.0 acres [4] $861 $1,200
Residence on 1.0 acres [4] $1,722 $2,401
Residence on 0.50 acres [4] $3,447 $4,801
Residence on 0.25 acres [4] $6,891 $9,601
Residence on 0.20 acres [4] $8,614 $12,002
Residence on 0.14 acres [4] $8,733 $12,239
Residence on 0.10 acres [4] $8,911 $12,597
Residential RD20 to RD30 $9,368 $13,578
Mobilehome Park $9,824 $14,561
Industrial $10,279 $15,542
Commercial (office/retail) $10,734 $16,523
Parking Lot $10,734 $16,523
Public School Campus [5] $7,091 $10,179
School Campus with detention [2] $7,091 $10,179
Sports Field graded with field drains $2,871 $3,837
Sports Field no piped field drains $2,871 $3,837
Sports Field with detention [2] $2,871 $3,837
Impervious areas of park [2] $10,734 $16,523