Background
The project will repair the sinkhole in the eastbound slow lane of Fair Oaks Boulevard east of Lantern Court. Maintenance staff determined the sinkhole is due to a hole in the drainage pipe crossing Fair Oaks Boulevard. Additionally, television inspection of the pipe revealed a prior pipe repair adjacent to the current sinkhole that is in poor condition. Maintenance staff installed a recessed trench plate as a temporary measure until this project is built.
Project Description
The project will repair the current hole/sinkhole and remove & replace the adjacent pipe repair. The work will occur within the eastbound slow lane and bike lane of Fair Oaks Boulevard. We estimate construction will take two weeks with work hours of 9am-3pm. Residents should expect construction noise and traffic impacts during the project. There may be intermittent traffic delays exiting Lantern Court.
Project Map
Quality Control
County Construction Management and Inspection Division will manage the field work and inspections for the project. David Phillips will be the construction inspector. He will resolve most field issues and ensure the work meets the design plans and specifications. Eyad Almasri will be the Resident Engineer overseeing construction and handling major field issues.
Project Schedule
- Begin construction – July 8, 2024
- End construction – July 19, 2024
All dates are tentative and subject to change
Project Newsletter
June 2024
Please Contact:
David Bolen
Project Engineer, (916) 874-8645
E-mail: bolend@saccounty.gov
Eyad Almasri
County Construction Management, (916) 879-3612
E-mail: almasrie@saccounty.gov
Marcus Gumm
Contractor, North Star, (530) 682-3951