Project Description
The project will rehabilitate the pipe with Cured-In-Place Pipe (CIPP) lining. CIPP lining installs an inner lining within the existing pipe creating a new pipe without the complications of traditional remove and replace construction. The project will line 16 pipe sections totaling 1,624 lineal feet to mitigate corrosion, root intrusion, and risk of pipe failure.
Project Updates
The project design is finalized and the project is scheduled for construction in summer 2025. The project went through an environmental review and was issued an exemption. The Sacramento County Board of Supervisors approved advertising the project for construction bids on May 13, 2025.
Project Location
The project will rehabilitate storm drain pipe at four locations throughout the County.
The sites are located at:
- Green Eyes Way, Green Top Way & Greenback Lane
- Lantern Court & Fair Oaks Boulevard
- Oakhollow Drive, Roseville Road, Tarleton Drive & Crowder Way
- Winsford Lane & El Camino Avenue
Project Schedule
- Final Plans & Specifications – May 2025
- Board of Supervisors Approval – May 2025
- Bid Opening – June 2025
- Board of Supervisors Award – August 2025
- Construction Begins – September 2025
- Construction Ends – November 2025
All dates are tentative and subject to changeFor More Information
David Bolen
Senior Engineer, (916) 874-8645
Alexander Barba
Principal Engineering Technician, (916) 874-6490