Zone 11W Fee and Credit Schedule

Engineering report for Zone 11W Plan Update

Vineyard Springs Supplemental Drainage

Credits

Schedule WEffective March 2, 2026
Riparian Enhancement Landscaping (Channel) [1] $89 /LF
Riparian Enhancement Landscaping (Basin perimeter) [1]$19/ LF
Erosion Control (Channel) [2]$14 / LF
Lineal Water Quality Features [3]$7,822 /EA
Trails and Drainage Maintenance Access 
Creel Trail Crossings 
Low Flow Crossings [4] 
Temporary Weir at G46 Basin 
Truck Haul [5]  

Real Estate Acquisition [6],[7]

Schedule WEffective March 3, 2026
Channel Easement in Future Channel Floodplain (from/to top of bank)$72,449 /AC
Upland Buffer (unincumbered) $181,123 /AC
Water Quality Basin Land (unincumbered) [8]$181,123 /AC
Basin and Channel Preserve (encumbered by aerial easement)$72,449 /AC
Channel (encumbered by underground utility easement) $9,057 /AC
Basin and Channel Preserve (encumbered by underground and arial easements)$45,642 /AC

NOTES

1. Credit amount shall be least of amounts listed on the schedule or actual cost

2. Jute mat or equivalent (hydroseed is paid by Zone 11A)

3. Credit for fine grading and erosion work at non-trunk inline water quality as shown on landscape plan

4. Credit amount shall be least of Schedule D unit prices or amount shown on Table 1

5. Price per cubic yard if material is excavated for the benefit of Water Resources and cannot be scraper hauled to a fill site (in addition to Zone 11A, Schedule D credit amount)

6. Credit amount for land shall be the least of listed values or valuation by County Real Estate Division

7. Land value will be reduced by the cost of wetlands that are being mitigated (off-site) by this fee plan

8. Only for water quality basins serving more watershed than lands controlled by the developer receiving the credits

Fees (per acre)  [use straight line interpolation]

Schedule WEffective March 3, 2026
Residence on 1.0 acre$16,632 /AC
Residence on 0.50 acre$17,131 /AC
Residence on 0.20 acre $20,117 /AC
Residence on 0.12 acre$21,995 /AC
Residential RD20 to RD30$24,425 /AC
Commercial and Parking Lots$27,011 /AC
Public School Campus$21,083 /AC
Active Park$0 /AC
Open Space$0 /AC

NOTES

Interpolate between above listed fees based on development density in same manner as Zone 11A fee