North Vineyard Station - Drainage Master Plan

 Drainage Master Plan

TitleUse SHIFT+ENTER to open the menu (new window).
File SizeUse SHIFT+ENTER to open the menu (new window).
Cover Sheets 920 KB
Table of Contents 25 KB
I Introduction 25 KB
II Synopsis of NVSSP DMP 24 KB
III Hydrologic and Hydraulic Analyses 29 KB
IV Approach 56 KB
V Existing Conditions 8 KB
VI Storm Drain Pipe System Analysis 8 KB
VII Drainage Facilities Phasing Analysis 52 KB
VIII Sensitivity Analysis 152 KB
IX Opinion of Probable Costs 17 KB
X Findings 8 KB
List of Tables 261 KB
Table 1 Phase A1 Conditions 35 KB
Table 2 Phase A2 Conditions 36 KB
Table 3 Phase B Conditions 36 KB
Table 4 Phase C Conditions 36 KB
Table 5 Phase D Conditions 37 KB
Table 6 Phase E Conditions 37 KB
Table 7 Ultimate Conditions 37 KB
Table 8 Summary of Probable Costs 23 KB
List of Figures 15251 KB
Figure 01 Location Map 870 KB
Figure 02 Elder and Gerber Creeks - Subbasin Map - Existing Conditions 685 KB
Figure 03 Ultimate Land Use 935 KB
Figure 04 Preferred Drainage Plan 706 KB
Figure 05 Basins E24A, G41, and G46 - Runoff Routing Methodology 36 KB
Figure 06 Typical Water Quality Swale/Channel Cross Section 30 KB
Figure 07 Existing Conditions Floodplain * 894 KB
Figure 08 Elder and Gerber Creeks - Subbasin Map - Developed Conditions 654 KB
Figure 09 Storm Drainage Facilities Plan (Oversized) 355 KB
Figure 10 Development Phasing 935 KB
Figure 11 Typical Detention Basin/Channel Cross Section 34 KB
Figure 12 Phase A1 Residual 100-Year Floodplain 860 KB
Figure 13 Phase A2 Residual 100-Year Floodplain 868 KB
Figure 14 Max Water Surface Profile - Elder Creek - Phase A1 259 KB
Figure 15 Max Water Surface Profile - Gerber Creek - Phase A1 250 KB
Figure 16 Max Water Surface Profile - Elder Creek - Phase A2 265 KB
Figure 17 Max Water Surface Profile - Gerber Creek - Phase A2 246 KB
Figure 18 Phase B - Residual 100-Year Floodplain 868 KB
Figure 19 Max Water Surface Profile - Elder Creek - Phase B 263 KB
Figure 20 Max Water Surface Profile - Gerber Creek - Phase B 242 KB
Figure 21 Phase C - Residual 100-Year Floodplain 883 KB
Figure 22 Max Water Surface Profile - Elder Creek - Phase C 268 KB
Figure 23 Max Water Surface Profile - Gerber Creek - Phase C 252 KB
Figure 24 Phase D - Residual 100-Year Floodplain 882 KB
Figure 25 Max Water Surface Profile - Elder Creek - Phase D 265 KB
Figure 26 Max Water Surface Profile - Gerber Creek - Phase D 258 KB
Figure 27 Phase E - Residual 100-Year Floodplain 872 KB
Figure 28 Max Water Surface Profile - Elder Creek - Phase E 259 KB
Figure 29 Max Water Surface Profile - Gerber Creek - Phase E 251 KB
Figure 30 Max Water Surface Profile - Elder Creek - 100/500-Year Comparison 287 KB
Figure 31 Drainage Facilities - Project Numbers 613 KB
Appendix A 666 KB
Appendix B 704 KB
Appendix C 997 KB
Appendix D 496 KB
Appendix E 2072 KB
Complete Drainage Master Plan​ 21253 KB